The datasets for EIS Data Compression (DC) factor investigation are chosen as follows:
1. search EIS study database to find out which study has adopted a specific compression scheme such as DPCM, JPEG95, etc. For example, study 29, 30, 31, 32, 91, 92, 142, 255, 258 have ever used JPEG90 compression scheme.
notes:
2. Once knowing details (eg. ID) of rasters, which using a specific compression scheme, one can extract original data volume for these rasters (through EIS planning database), and the corresponding fits files (through EIS science database), then work out the data set for the investigation. The file datasets_list.txt lists the datasets used in this case.
notes:
The way to calculate EIS on-board compressed data volume with MDP status curves was described in previous post abut EIS DC factor: check it here.
The following links show DC factor variation in different scenarios (eg. AR, QS for SCI_OBJ, 1", 2", 40", and 266" for SLA).
A conservative estimation of average factor is indicated by orange dash-line on the plot, which could be used to improve EIS planning tools.
note:
EIS Data Compression (DC) factors listed here are only for Science Target & Slit/Slot selection. For factor variation upon exposure time, please refer H. Hara's , (PDF)
For easy analysis a data table can be worked out as follows, using the plots shown in above links:
Scheme | Total | QS | AR | CH | 1" | 2" | 40" | 266" |
---|---|---|---|---|---|---|---|---|
DPCM | 2.19 | 2.19 (2.38) | 2.19 | 2.19 | 2.54 | 2.46 | 2.19 | 2.18 |
JPEG98 | 2.33 | 2.46 | 2.22 | 3.15 | 2.85 (avg) | 2.31 | 2.28 (2.32) | |
JPEG95 | 3.26 | 3.64 | 3.26 | 6.12 | 6.38 (6.54) | 3.26 | ||
JPEG92 | 3.63 | 3.31 (avg) | 6.65 (avg) | 2.74 (avg) | 6.53 (avg) | 2.74 (avg) | 3.63 (avg) | |
JPEG90 | 3.82 | 3.82 | 4.34 | 3.73 | 4.67 (avg) | 3.84 | 3.78 | |
JPEG85 | 4.51 | 4.82 | 4.51 | 4.91 | 3.9 (avg) | 4.51 | ||
JPEG75 | 6.20 | 6.2 | 18.88 (avg) | 6.2 | 7.52 | |||
JPEG65 | 7.33 | 19.94 (avg) | 25.97 (avg) | 7.33 (avg) | ||||
JPEG50 | 17.72 | 20.98 | 17.72 | 35.37 (avg) | 17.72 |
Using DC factos (ie. 'total' in above table) to do trend fitting and compare wth those previous numbers used in EIS planning tool, we have:
total EIS DC factor:
DPCM | JPEG98 | JPEG95 | JPEG92 | JPEG90 | JPEG85 | JPEG75 | JPEG65 | JPEG50 |
---|---|---|---|---|---|---|---|---|
2.19 | 2.33 | 3.26 | 3.63 | 3.82 | 4.51 | 6.20 | 7.33 | 9.36 |
previous EIS DC factor:
DPCM | JPEG98 | JPEG95 | JPEG92 | JPEG90 | JPEG85 | JPEG75 | JPEG65 | JPEG50 |
---|---|---|---|---|---|---|---|---|
2.36 | 2.70 | 3.47 | 4.22 | 4.63 | 5.74 | 7.63 | 9.43 | 12.00 |
The orange dash-line in the figure can be described using equation: Y = 2.11768 + 0.556287*X - 0.0855122*X2 + 0.0161953*X3
Thus, the corresponding numbers on the line are:
DPCM | JPEG98 | JPEG95 | JPEG92 | JPEG90 | JPEG85 | JPEG75 | JPEG65 | JPEG50 |
---|---|---|---|---|---|---|---|---|
2.12 | 2.60 | 3.02 | 3.45 | 4.01 | 4.79 | 5.89 | 7.38 | 9.39 |
However in this calculation it looks that there is difference, but not too big, of compression factor in different scenarios, especially for example the DPCM compression (values are close to 2.19). This gives an idea we may use a set of single value of EIS compression factor for simplicity.
strat: 2008-05-01T05:48:33
end: 2008-05-01T05:50:03
It's clear that: if using start-time & end-time in fits header, then the calculated MDP data volume is 0; if using raster duration to get end-time, only partial MDP data packets will be counted; using study duration seems fine to get completed data volume.
Another example: eis_l0_20080501_190013.fits.gz:
start: 2008-05-01T19:00:13
end: 2008-05-01T19:01:35
For this fits file, if using start-time & end-time in fits header, then only half MDP data packets are counted, which making compression factor double; if using raster duration and study duration to get end-time, both will get completed data volume and generate reasonable compression factor.
This mismatch, ie. the data coming is slower than the expection, might explain MDP data recorder full on-board, for example, in the case that EIS data packets for previous and current studies are coming very close in time!