This page (revision-25) was last changed on 02-Feb-2017 13:19 by PeterYoung

This page was created on 12-Apr-2007 18:31 by UnknownAuthor

Only authorized users are allowed to rename pages.

Only authorized users are allowed to delete pages.

Version Date Modified Size Author Changes ... Change note
25 02-Feb-2017 13:19 394 bytes PeterYoung to previous
24 07-Jul-2010 22:42 336 bytes PeterYoung to previous | to last
23 16-Jun-2010 22:15 359 bytes PeterYoung to previous | to last
22 16-Nov-2009 22:14 332 bytes PeterYoung to previous | to last
21 22-Jul-2008 11:12 299 bytes David R Williams to previous | to last

Difference between version and

At line 1 added 3 lines
[{ALLOW edit EISMainUsers}]
[{ALLOW view Anonymous}]
this is just a test
At line 5 added 6 lines
!!AI 1: DRW/DHB to confirm the files to be retrieved by RCO from EISCO
* ''It is anticipated that only the TL DB (plus CP files – e.g. pointing, SAA ...etc) to be retrieved. No CPT files are needed as "run CPT" will be performed on the EIS-CO machine (TBC).''
----
[NRL test page|EISAnalysisGuide]