This page (revision-43) was last changed on 18-Apr-2021 19:03 by JianSun

This page was created on 24-Apr-2008 18:38 by JianSun

Only authorized users are allowed to rename pages.

Only authorized users are allowed to delete pages.

Page revision history

Version Date Modified Size Author Changes ... Change note
43 18-Apr-2021 19:03 5 KB JianSun to previous
42 02-May-2008 17:30 5 KB JianSun to previous | to last
41 01-May-2008 03:17 5 KB David R Williams to previous | to last

Page References

Incoming links Outgoing links

Version management

Difference between version and

At line 1 changed 3 lines
[{ALLOW edit EISMainUsers}]
[{ALLOW view Anonymous}]
The __compression factor__ of on board EIS data may vary depending on a few factors such as the observing target (QS, AR, CH, etc), slit/slot selection, exposures, etc.
The compression rate of on board EIS data may vary depending on a few factors such as the observing target (QS, AR, CH, etc), slit/slot selection, exposures, etc.
At line 5 changed one line
The purpose of this study is trying to investigate how different compression schemes effect EIS data volume on board (MDP) and work out a better estimation of compression factor for compression scheme (eg. DPCM, JPEG98, JPEG95, etc.)
The purpose of this study is trying to investigate how different compression schemes effect EIS data volume on board and work out a better estimation of compression rate for compression scheme (eg. DPCM, JPEG98, JPEG95, etc.)
At line 7 changed one line
!The approach:
The approach:
At line 9 changed one line
1. to get actual data volume from MDP status information: the inclined curve means data packets from EIS on MDP increasing, the vertical curve means data packets dumped to ground station. So in general, knowing a raster's start and end time one can fitstly calculate actual data volume in that duration, and then compare it with the designed data volume in raster's definition, to get data compression factor.
1. to get actual data volume from MDP status information: the inclined curve means data packets from EIS on MDP, the vertical curve means data packets dumped to ground station. So in general, known a raster's start and end time can calculate actual data volume, and then compare it with the designed data volume of this raster to get data compression rate.
At line 15 changed one line
3. prepare plots based on various factor combinations: compression factor vs. slit/slot, factor vs. target, factor vs. exposures
3. prepare plots based on various factor combinations: compression rate vs. slit/slot, rate vs. target, rate vs. exposures
At line 17 removed one line
\\
At line 19 removed one line
!!Some preliminary results (plots):
At line 21 removed one line
\\
At line 18 added one line
----
At line 24 changed 2 lines
''The investigation here is for date sets obtained mainly between %%(color:#cc0000;)2007-Sep-15 and 2007-Dec-15%%, as EIS operations were most efficient and stable over this duration. The other data sets inluded here are: %%(color:#cc0000;)2008-Mar%% (for JPEG85), %%(color:#cc0000;)2006-Dec%% (for JPEG75), %%(color:#cc0000;)2007-Jan to 2007-Apr%%, and %%(color:#cc0000;)2008-Feb%%.
''
Some preliminary results (plots):\\
At line 22 added 3 lines
(The investigation here is for dates between %%(color:#cc0000;)2007-Sep-15 and 2007-Dec-15%%, as EIS is operationally stable over this duration. The other data sets is in %%(color:#cc0000;)2008-Mar%% (for JPEG85), and %%(color:#cc0000;)2006-Dec%% (for JPEG75))
At line 47 removed one line
\\
At line 50 changed one line
The __average values__ of compression factor for each scheme are listed in following %%(color:#c00;)Sortable Table%% (although only a single number can't show the compression factor varation over a large dataset).
%%information
For target selection, in this case, uses value of %%(color:#cc0000;)SCI_OBJ%% keyword instead of %%(color:#cc0000;)TARGET%% keyword as the later is only for (study/raster) design stage, the actual targets are decided during the EIS planning.
At line 52 changed 17 lines
%%sortable
|| Scheme || Total || QS || AR || CH || 1" || 2" || 40" || 266" || 10s || 15s || 20s || 30s || 60S
|DPCM |2.52|2.80|2.80|2.70|3.0|2.96|3.63|2.49|3.08|3.01|2.5|2.6|2.42
|DPCM | | | | | | | |QS|3.14|2.94|2.91|2.52|2.32
|DPCM | | | | | | | |AR|2.96|3.0|2.35|2.5|2.14
|DPCM | | | | | | | |CH| |3.05|2.52|2.88|2.47
|JPEG98|2.56|2.67|2.46|3.44|2.80|2.36|2.56| |3.21|2.54| |2.4|
|JPEG98| | | | | | | |QS|3.32|2.60| |2.43|
|JPEG98| | | | | | | |AR|3.17|2.42| |2.49|
|JPEG98| | | | | | | |CH|3.6| | | |
|JPEG95|6.25|6.12|6.38| |6.23|6.3| | |5.86| |4.60| |
|JPEG95| | | | | | | |AR|5.82| |4.08| |
|JPEG90|8.11|7.39|8.6|8.4|4.85| |5.04|8.34| | | |5.04|
|JPEG90| | | | | | | |QS| | | |3.87|
|JPEG90| | | | | | | |AR| | | |3.81|
|JPEG85|5.56|5.58|4.92|6.21| | |5.56| | | | | |
|JPEG75|11.39| | | | | | |11.39|11.39| | | |
However, there is not always having value for SCI_OBJ in EIS fits header, also the range of value of SCI_OBJ keyword is varying, ([SCI_OBJ_Example]), sometimes we have to throw away some EIS data as it's hard to judge the SCI_OBJ belong to QS,AR or CH, eg. LMB, or FIL.
At line 71 removed 23 lines
However, the number shown above has difference from previous work done by others, eg, Hara'san result:
{{{
> 40" SLOT
> DPCM 2.36
> JPEG98 2.70
> JPEG95 3.47
> JPEG92 4.22
> JPEG90 4.63
> JPEG85 5.74
> JPEG75 7.63
> JPEG65 9.43
> JPEG50 12.0
> For 10s exposure time. }}}
\\
This work is just a start, the method and results shown here need to check again, and compare with other numbers. !As I mentioned above, these are only preliminary results on EIS compression factor. Still there are more need to be done, so any contributions, comments and suggestions are very helpful!\\
----
At line 95 changed 4 lines
As for target selection, in this case, I uses value of %%(color:#cc0000;)SCI_OBJ%% keyword instead of %%(color:#cc0000;)TARGET%% keyword as the later is only meaningful at (study/raster) design stage, the actual target is chosen during the EIS planning.
However, sometimes there is no value for SCI_OBJ in EIS fits header, and sometimes there are two many values (see [SCI_OBJ_Example]). Lots of EIS dataset are thrwon away as hardly to decide to which catagroy the SCI_OBJ belongs to, such as QS,AR or CH.
There is a compensation for paused (and aborted) raster. This is implemented by comparing %%(background-color:#009900;)NEXP%% and %%(background-color:#009900;)RAST_REQ%% and times the ration of two values
At line 56 added one line
At line 101 changed 4 lines
Compensation has been applied for those paused (and aborted) rasters. This is implemented by comparing %%(color:#cc0000;)NEXP%% and %%(color:#cc0000;)RAST_REQ%% and timing the ratio of two values.
%%
%%information
There is a structure array to store all related information for the EIS data investigated here. The array has element with the following format:
The related information for investigated EIS data set has been stored in a structure array, which has elements with the following format:
At line 129 changed one line
I attached an IDL sav file [here|https://vsolar.mssl.ucl.ac.uk/eiswiki/images/newgifs/20071201_20071215.sav.tar.gz]. You may download and play it, for example, I use:
I attached the IDL sav file [here|http://msslxr.mssl.ucl.ac.uk:8080/eiswiki/images/newgifs/20071201_20071215.sav.tar.gz]. Please download it and play it with your self, for example, I use:
At line 133 changed one line
to extract records associated with 'QS' SCI_OBJ and using DPCM compression scheme.
to find those records having 'QS' SCI_OBJ and using DPCM compression scheme.